Condenser Heat Rejection Calculation
Calculates the total thermal load to be dissipated from a refrigeration cycle and determines the required cooling medium flow rate based on energy balance and safety margins.
📖 Need the theory? Read the methodology, assumptions, and equations in the full reference guide.
1. Define Input Parameters
2. Engineering Output
Base Condenser Duty (Q_cond_base)
- kW
- kW
Design Condenser Duty (Q_cond_design)
- kW
- kW
Temperature Rise (dT)
- °C
- °C
Duty Ratio (R_duty)
- dimensionless
- dimensionless
Cooling Water Mass Flow Rate (m_dot)
- kg/s
- kg/s
Need this calculation offline?
Download Offline Excel CalculationContext & Assumptions
This calculation is essential for sizing heat exchange equipment in HVAC and industrial refrigeration systems. It ensures the condenser can handle both the evaporator load and compressor work while maintaining operational stability through empirical validation of duty ratios and temperature rises.
Legal Disclaimer & Limitation of Liability
The results provided by this tool are for educational and preliminary estimation purposes only.
NO WARRANTY: MyEngineeringTools.com makes no warranties, express or implied, regarding the accuracy or applicability of these results to any specific engineering project.
LIMITATION OF LIABILITY: MyEngineeringTools.com SHALL NOT BE LIABLE for any direct, indirect, incidental, or consequential damages arising from the use of this data.
All results MUST be independently verified by a qualified professional engineer before implementation in any industrial or physical environment.